Customization: | Available |
---|---|
CAS No.: | 1344281 |
Formula: | Al2O3 |
Still deciding? Get samples of US$ 30/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application method | Trowel |
Applications | Protective Coating |
Color | Gray |
Cure type | Room Temperature (Ambient) Cure, Two Component Mix |
Drying time | 6.0 hr. |
Key characteristics | Abrasion Resistant, Prolongs Equipment Life, Renews Worn Surfaces, Sag: Non-Sag, Wear Resistant |
Mix ratio, by volume | 3 : 1 |
Particle size | Large |
Physical form | Paste |
Substrates | Metal |
1. Apply fully mixed material to the prepared surface .
1. Cleaning:Remove dirt,oil, grease,loose flanky rust etc.,with a suitable high pressure water cleaning system .
2. Blasting:Blast all surfaces to be coated,with a sharp edged angular grit,such as aluminum oxide,to a depth of profile of approximately 75 microns and a degree of cleaniness of very thorough Blast Claeaning/Near Whitef.
3. Cleaning:After blasting metal surfaces should be cleaned with a waterless or solvent,and allow the surface to dry before application of the product coat the surface before any oxidation or contamination takes place.
4.Protection From Flash Rusting:To avoid flash rust,repairs should be made as soon as possible or within a mixmum 2 hours of blasting.
5. Mixing The Material:Measure 2 parts resin to 1 part hardener by volume or weight if doing a partial kit.Otherwise,mixing a full kit is pre-measured at the correct ratio.For a full kit mix ,a spiral mixing blade attached to a high torque electric or pneumatic drill can be used.For a partial kit transfer measured quantities onto a clean and dry mixing surface to mix together witha trowel until uniform in color.If resin and hardener temperatures are 15ºC or below,preheat resin only,to about 30ºC but not to exceed 40ºC.
6. Application:Apply fully mixed material to the prepared surface.Initially apply the material in a very thin layer to "wet" out the surface and ensure full epoxy contact with the roughened surface. Build up to desired thickness(minimum 6 mm),avoiding air entrapment.At 25ºC,the working time is 15 minutes and functional cure time is 4 hours Working and cure time depend on temperature and mass the higher the temperature and the larger the mass,the faster the cure.
10kg/set carton size: 32x32x32.5cm
Jiangxi Gooz Co., Ltd was establish from 1990. Over 20 years professional manufacture experience ,we become one of the largest Manufacture on Adhesive in Jiujiang City Jiangxi, China.
FAQ