Customization: | Available |
---|---|
CAS No.: | 1344281 |
Formula: | Al2O3 |
Still deciding? Get samples of US$ 1.5/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application method | Trowel |
Applications | Protective Coating |
Color | Gray |
Cure type | Room Temperature (Ambient) Cure, Two Component Mix |
Drying time | 7.0 hr. |
Key characteristics | Abrasion Resistant, Prolongs Equipment Life, Renews Worn Surfaces, Sag: Non-Sag, Wear Resistant |
Mix ratio, by volume | 2 : 1 |
Particle size | Large |
Physical form | Paste |
Substrates | Metal |
1. Cyclone and separator bodies
2. Dust collectors and exhausters
3. Pump liners and impellers
4. Fan blades and housings
5. Chutes and hoppers
6. Elbows and transition points
1. Cleaning:Remove dirt,oil, grease,loose flanky rust etc.,with a suitable high pressure water cleaning system .
2. Blasting:Blast all surfaces to be coated,with a sharp edged angular grit,such as aluminum oxide,to a depth of profile of approximately 75 microns and a degree of cleaniness of very thorough Blast Claeaning/Near Whitef.
3. Cleaning:After blasting metal surfaces should be cleaned with a waterless or solvent,and allow the surface to dry before application of the product coat the surface before any oxidation or contamination takes place.
4.Protection From Flash Rusting:To avoid flash rust,repairs should be made as soon as possible or within a mixmum 2 hours of blasting.
5. Mixing The Material:Measure 2 parts resin to 1 part hardener by volume or weight if doing a partial kit.Otherwise,mixing a full kit is pre-measured at the correct ratio.For a full kit mix ,a spiral mixing blade attached to a high torque electric or pneumatic drill can be used.For a partial kit transfer measured quantities onto a clean and dry mixing surface to mix together witha trowel until uniform in color.If resin and hardener temperatures are 15ºC or below,preheat resin only,to about 30ºC but not to exceed 40ºC.
6. Application:Apply fully mixed material to the prepared surface.Initially apply the material in a very thin layer to "wet" out the surface and ensure full epoxy contact with the roughened surface. Build up to desired thickness(minimum 6 mm),avoiding air entrapment.At 25ºC,the working time is 15 minutes and functional cure time is 4 hours Working and cure time depend on temperature and mass the higher the temperature and the larger the mass,the faster the cure.
500g/set, 5kg/set, 10kg/set, 13.7kg/set and 20kg/set
10kg/set carton size: 32x32x32.5